The mayor of Mula, Juan Jesús Moreno, and the Director General of Roads, José Antonio Fernández Lladó, together with councilors of the municipal Corporation, have visited the repair works and the bridge over the Almoloya ravine on the regional C-5 highway at kilometer 19, past the Muleña hamlet of Casas Nuevas.An urgent action has had to be taken to fix the overhang of the bridge that was seriously damaged as a result of the rains of the last DANAS suffered in the area and the force of the water when the Almoloya ravine emerges in episodes of cold drops.
.The mayor and the general director have called for a meeting next week in which the integral arrangement of the regional C-5 highway between the hamlet of Casas Nuevas and the crossing of the Port will be requested; the comprehensive arrangement of the RM-C1 regional highway between Fuente Librilla and Alcantarilla; the arrangement of the Curtís C-20 highway and the arrangement and maintenance of various sections of the regional network of secondary roads in the municipality of Mula.</body> </html>
Source: Ayuntamiento de Mula