Portal de Mula

www.portaldemula.com

Mula - SpanishMula - English
detail of Mula

 

The works to replace the pavement and infrastructures on Altos de Santo Domingo Street begin (10/12/2020)

The Department of Urbanism and Public Works is carrying out the works of replacement of pavement and infrastructure in Altos de Santo Domingo street, which has been awarded for 118,000 euros (VAT included) from the municipal budget.The action consists fundamentally in the cleaning and reinforcement of the existing masonry wall; cutting the pavement and demolition of the concrete slab; renovation of the sanitation network; the renewal of the drinking water network; the installation of conduits for the underground wiring; the excavation and removal of ancient bases; filling, spreading and compacting gravel bases; the final paving of the street with printed concrete; and the vertical and horizontal signaling of parking areas and road restrictions.Francisco J.

Llamazares, councilor for Urban Planning and Public Works, has stated that it is an essential and much-needed investment in the upper neighborhoods, since the breakdown of the old sewage collectors was causing dampness and putting the stability of homes and houses at risk.

of the masonry wall that supports the street.

The work has a certain complexity due to the difficulty in accessing machinery and materials; but it is a priority action within the planning of the European Kairós project to stop the deterioration of the medieval neighborhoods of the city and improve the living conditions of the residents of this historic street.

Source: Ayuntamiento de Mula

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información